Our pilot project

Project for distribution of drinking water in Africa.

Installation of water unit AguaSmart for ground water from drilling with a production of 180 m3 / day. Production of 20 m3 / day from sea water.

The water to filter must be analyzed.

L’attribut alt de cette image est vide, son nom de fichier est Screenshot-2024-09-26-at-10.19.26.png.

Filling unit for gallons

Options for distributions

Depends on country and project.

  • Cargo bike, Tuk-Tuk
  • Agro-alimentary tanks for drinking water : 5 à 500 m3

OPtions

Depends on country and project.

  • Transport of items
  • Installation of units
  • Mission for Study / Marketing
  • Drilling : (according location – deepth, daily volume)
  • Générator : (according units to operate)

Distribution

Gallons

Capacity from 10 to 20 liters, refillable.

« Bag in Box »

Capacity from 3 to 5 liters, refillable.

Remarques importantes

We need a spot of 3/ 5.000 m2 to set-up the project, with all the different units : drilling, with capacity of 200 m3/ day, warehouse to stock the goods, to set-up filling units, offices, etc…

And near of a road for easy distribution and communication

Production de bloc de glace

Production of ice blocks from 5, 10, and 20 Kg.

Budget upon request.