Project for distribution of drinking water in Africa.
Installation of water unit AguaSmart for ground water from drilling with a production of 180 m3 / day. Production of 20 m3 / day from sea water.
The water to filter must be analyzed.
Filling unit for gallons
Options for distributions
Depends on country and project.
- Cargo bike, Tuk-Tuk
- Agro-alimentary tanks for drinking water : 5 à 500 m3
OPtions
Depends on country and project.
- Transport of items
- Installation of units
- Mission for Study / Marketing
- Drilling : (according location – deepth, daily volume)
- Générator : (according units to operate)
Distribution
Gallons
Capacity from 10 to 20 liters, refillable.
« Bag in Box »
Capacity from 3 to 5 liters, refillable.
Remarques importantes
We need a spot of 3/ 5.000 m2 to set-up the project, with all the different units : drilling, with capacity of 200 m3/ day, warehouse to stock the goods, to set-up filling units, offices, etc…
And near of a road for easy distribution and communication
Production de bloc de glace
Production of ice blocks from 5, 10, and 20 Kg.
Budget upon request.